1) Will the scheduled calibration be performed prior to the end of the month of the due date? If so, you can specify this leeway in your SOP and continue to use the equipment until calibrated.
2). If you are out of calibration (beyond the end of month the cal is due) you must take it out of service.
I do not suggest deviation, but that doesn't mean it isn't an option. Anyone?
------------------------------
Mary AnnGreenawalt
------------------------------
Original Message:
Sent: 13-Feb-2017 14:18
From: Anonymous Member
Subject: Calibration
This message was posted by a user wishing to remain anonymous
Good afternoon forum
What will be the consequences on using an equipment that is not calibrated. The calibration service has been schedule but I can't stop production due to this issue. How I can be able to have a deviation and continue using the equipment until calibration is performed.