Regulatory Open Forum

 View Only
  • 1.  LIMS

    This message was posted by a user wishing to remain anonymous
    Posted 06-Apr-2018 11:41
    This message was posted by a user wishing to remain anonymous

    ​Do I need a LIMS system in place for a Phase 2 study? Does it need to be qualified or GMP or ???  Thanks.


  • 2.  RE: LIMS

    Posted 13-Apr-2018 16:16
    Hello,

    The question is very vague, could you please provide more details?

    With the limited information, my understanding is LIMS is required only if your lab is managing the samples from Phase 2 study and some analysis (e.g. Bioanalysis). If you are then the system should be validated and fit for GCLP use. (Good Clinical and Laboratory Practices).

    ------------------------------
    Loganathan Kumarasamy
    Senior Consultant
    Waukegan IL
    United States
    ------------------------------